top of page

Large PV Solar Array System

PROJECT INFO

5,148 solar panels capture the sun's solar power and output DC power to AC inverters. Specialized transformers then boost the voltage to 12,470 volts before coupling into the district owned primary power distribution system.

 

Cumberland Valley School District engaged FacTech to perform professional commissioning and project management services for one of the state's largest public education solar PV array installations. Today, the solar array system is generating power to supply the entire CVSD main campus, directly offsetting grid power consumption while generating Solar Renewable Energy Credits (SREC's).

Services Include:

  • Project Management

  • Project Closeout 

  • New Construction Commissioning

  • Digital document generation and archiving

  • Complete LEED Functional/Performance Tests

  • Site inspections and Field Reports

  • Preliminary Cx Report 

  • Final Cx Report 

Project:

Large PV Solar Array System Integration

Market:

Educational

Location:

Mechanicsburg, PA

Client:

Cumberland Valley School District

Size:

5,148 Solar Panels

1.2 Megawatts

Cost:

$4 Million

solar panels.jpg
FacTech Transparent.png

LEED Certified

081512.Greer-Business-Center-Receives-LE
download (1).jpg

ASHRAE Accredited

SUITE A 100 WINDING CREEK BOULEVARD MECHANICSBURG, PA 17O5O (814) 414-4754 WWW.FACTECHINC.COM

©2026 by FacTech. Proudly created with Wix.com

bottom of page