top of page

Bedford Area Middle School

PROJECT INFO

​

Commissioning expertise was provided by FacTech to ensure the realization of the 100,000 sq. ft. renovation project. 

​

With an emphasis on attaining USGBC LEED certification, our team successfully established a project that was met with high quality energy saving systems which led to a healthy and clean educational environment for both the students and staff.

 

The end result featured a 15,000 sq. ft. addition on top of the 85,000 sq. ft. in renovations, all the while decreasing costs by 25% upon completion of construction.

​

Services Include:​

  • New Construction Commissioning

  • Recommissioning

  • Digital Document Generation and Archiving

  • Complete LEED Functional/Performance Tests

  • Site inspections and Field Reports

  • Preliminary Cx Report 

  • Final Cx Report 

Project:

Renovations, Additions, and Other Enhancements to the Bedford Area Middle School

Market:

Educational

Location:

Bedford, PA

Client:

Bedford Area School District

Size:

100,000 sq. ft.

Cost:

$12.5 Million

Geothermal%20room_edited.jpg
FacTech Transparent.png

LEED Certified

081512.Greer-Business-Center-Receives-LE
download (1).jpg

ASHRAE Accredited

SUITE A • 100 WINDING CREEK BOULEVARD • MECHANICSBURG, PA 17O5O • (814) 414-4754 • WWW.FACTECHINC.COM

©2026 by FacTech. Proudly created with Wix.com

bottom of page